Skip to main content

How Can I Split a Project Between Two or More Vehicles in Dispatch?

Learn how to split a delivery across multiple vehicles in Goodshuffle Pro Dispatch using logistic services and Digital Pull Sheets.

Written by Sierra Burton

To access this feature, you must be on Goodshuffle Pro Standard or above.

If a project needs more than one vehicle because of space or weight, you can add two (or more) logistic services to the contract to reflect that it's a multi-truck job, then route each of those logistics on a separate truck. Here's how to manage that workflow in Dispatch:


Step 1: Add Multiple Logistic Services

  1. On your project, add two (or more) Logistic Services to reflect the need for multiple vehicles.
    🔗 How to add multiple logistic services to a project


Step 2: Assign Each Logistic to a Separate Vehicle

  1. In the Dispatch → Route Planner, assign each Logistic Service to a different truck or vehicle.
    🔗 How to route different logistics across vehicles


Step 3: Use Digital Pull Sheets or Mobile Fulfillment for Loading

There isn't a way to assign specific inventory to a specific truck in the system. Instead, have your team mark all items as “loaded” from the Digital Pull Sheet as they load each item onto either truck. Your crew can:

  • Use the Digital Pull Sheet to mark each item as “loaded” as they go.

  • Physically divide and load items based on your vehicle capacity plan.


This helps with accountability across your team at the time of loading and ensures that all items on the job are dropped off between the two trucks, even when the load is split.


Need Additional Support?

Click the blue chat bubble in the bottom corner of your screen to message our support team—we’re happy to help!

Did this answer your question?